pharma machinery list

Pharma Machinery List: Tablet, Capsule, Liquid (Schedule M)

Plant setup · Machinery planning

By Darshan Singh (23+ years in QC, QA and drug regulatory affairs) · Published 12 Apr 2025 · Updated 12 Oct 2026

Pharma machinery list: the short answer

In India, the starting point for a section-wise pharma machinery list is not a vendor catalogue. It is Part XIII, “Requirements of Plant and Equipment”, of Revised Schedule M, notified as G.S.R. 922(E) on 28 December 2023.[1] Part XIII names the equipment it recommends for each dosage section and a minimum floor area for each.

A tablet section needs four separate areas: granulation and drying, compression, packaging, and coating where required. Part XIII lists 23 items across them. A hard-gelatin capsule section needs 6 listed items inside an enclosed, air-conditioned, dehumidified room with an airlock. An oral liquid section needs 9 listed items, from mixing tanks to a pilfer-proof cap sealer. Utilities such as HVAC, purified water and dust extraction are not in the Part XIII lists, but Parts I, VIII and IX of the same schedule make them unavoidable.

23items listed for a coated-tablet section (Part XIII, 3.1)
60 + 20 m²minimum basic + ancillary area for uncoated tablets
+30 + 10 m²additional area recommended for a coating section
25 + 10 m²per capsule section (penicillin and non-penicillin each)
30 + 10 m²minimum for an oral liquid section

How the machines line up in a tablet section

The order of the machines follows the order of the process. In a wet-granulation tablet line, each step below maps to at least one item in Part XIII:

  1. 01Dispensing
  2. 02Sifting
  3. 03Wet granulation (RMG)
  4. 04Drying (tray dryer / FBD)
  5. 05Sizing (multi mill)
  6. 06Blending and lubrication
  7. 07Compression
  8. 08De-dusting and inspection
  9. 09Coating
  10. 10Strip / blister packing

A direct-compression product skips steps 03 to 05. That is the main reason two tablet plants of the same output can have very different machinery bills.

Section-wise pharma machinery list (mapped to Schedule M)

Each row shows where the requirement comes from. The Part XIII rows are the equipment Schedule M recommends by name. The Clause rows come from a binding clause elsewhere in the schedule. The Practice rows are the author’s plant-floor recommendation and are not a regulatory requirement.

Tablet section machinery list

Part XIII, clause 3, says the tablet department “shall be divided into four distinct and separate sections” and that each compression machine shall be isolated in a cubicle connected to a vacuum dust collector or exhaust system.[1]

Scroll the table sideways →

MachineJob in the processBasisWhat to specify when buying
(a) Granulation-cum-drying
Disintegrator and sifter (vibro-sifter)De-lumps and screens raw materials. All dry ingredients must be sifted before use unless the process says otherwise (Part VIII 1.4).Part XIIIMesh range, sieve-integrity check, and dust extraction or a closed system (Part VIII 2.1).
Powder mixer (double-cone, octagonal or bin blender)Dry mixing and final lubrication.Part XIIIWorking volume matched to batch size, fill range, stainless contact parts.
Mass mixer, planetary mixer or rapid mixer granulator (RMG)Wet massing and granulation.Part XIIIImpeller and chopper speed control. Recording of mixing time, which Part VIII 2.3 requires in the batch record.
Granulator (oscillating granulator or multi mill)Sizes wet and dried granules. Listed “wherever required”.Part XIIIScreen sizes, speed range, knife and blade options.
Tray dryer (thermostatic hot-air oven) or fluid bed dryer (FBD)Dries granules to target moisture.Part XIIIFiltered inlet air. A filter-bag policy: bags washed between products, and product-specific bags for potent products (Part VIII 2.4).
Weighing machinesDispensing and in-process weighing.Part XIIIRange and readability matched to the quantities weighed, calibrated to a fixed schedule (Part I 13.5).
(b) Compression
Tablet compression machine (single, multi-punch or rotary)Compresses lubricated granules into tablets.Part XIIINumber of stations, tooling type, maximum compression force, and a dust control or cubicle arrangement (Part VIII 3.1).
Punch and die storage cabinetsControlled storage and inspection of tooling.Part XIIISlots per tooling set, plus a tooling issue and inspection log.
Tablet de-dusterRemoves surface powder. Part VIII 3.5 prefers an automatic device.Part XIIIMounted in line at the press outlet.
Tablet inspection unit or beltRemoves visual defects and foreign material.Part XIIILighting, belt speed, reject collection.
In-process testers: single-pan electronic balance, hardness tester, friability and disintegration apparatusIn-process checks at intervals of not more than 30 minutes (Part VIII 3.8).Part XIIIPlaced in the compression area and calibrated.
Dissolution test apparatusListed “wherever required”.Part XIIINumber of vessels, apparatus type per your product monographs.
Air-conditioning and dehumidificationListed “wherever necessary” for compression.Part XIIIRH set-point driven by your most moisture-sensitive product.
Metal detectorSupports the Part VIII 3.5 duty to monitor tablets for foreign material.PracticeSensitivity for ferrous, non-ferrous and stainless test pieces, with an auto-reject.
(c) Packaging
Strip or blister packing machinePrimary packing.Part XIIIInspection for misprints, foil cuts, missing tablets and improper sealing (Part VIII 7.3).
Leak test apparatus (vacuum system)Periodic vacuum test of strips and blisters (Part VIII 7.4).Part XIIIVacuum range and a calibrated gauge.
Tablet countersBottle packs. Listed “wherever applicable”.Part XIIICount accuracy, and line clearance of “rogue” tablets (Part VIII 7.1).
Air-conditioning and dehumidificationListed “wherever applicable” for packing.Part XIIIAs for compression.
(d) Coating (wherever required)
Jacketed kettle (steam, gas or electric heated)Prepares the coating suspension.Part XIIIStainless steel or other appropriate material. Suspensions made fresh and their use recorded (Part VIII 4.2).
Coating pan (stainless steel)Film or sugar coating. A perforated auto-coater is the modern form.Part XIIIFiltered drying air of suitable quality (Part VIII 4.1), spray system, batch capacity.
Polishing panListed “where applicable”.Part XIIICapacity matched to the coating pan.
Exhaust system with vacuum dust collectorRemoves powder and solvent fumes (Part XIII 3.2).Part XIIIInterlocked with the air-handling unit (Part VIII 1.22).
Air-conditioning and dehumidification, plus a weighing machineTwo separate Part XIII items for the coating room.Part XIIITemperature and RH control (Part VIII 4.1).

Build your machinery checklist

Pick a section, a product family and a line scale. The builder returns the Part XIII baseline, the clause-driven extras, the minimum area and the segregation rule that applies. Copy the list into your project file or vendor enquiry.

1. Dosage section

2. Product family

3. Line scale

Pick a dosage section to start your list

The list, the minimum area and the segregation rule will appear here.

    Tags in the list: XIII = Part XIII item; VIII, IX or I = clause in that Part of Revised Schedule M; Practice = author’s recommendation.

    Three rules that change the machinery list

    1. Part XIII is a baseline. Parts I, VIII and IX decide whether you pass.

    Every Part XIII list is introduced with “the following equipment is recommended”, and every area figure “is recommended”. The binding duties sit in the rest of the schedule: equipment that is non-reactive with the product (Part I 13.9), qualification through DQ, IQ, OQ and PQ (Part I 5.3), validated cleaning of shared equipment (Part I 13.12), dust control on every press (Part VIII 3.1), and purified water within microbial limits (Part IX 3.1). A plant can own every listed machine and still fail on these.[1] Our Schedule M area requirements by dosage form guide makes the same point about floor area.

    2. Penicillins need their own facility, not only their own machines

    Part I 12.6.1 requires “dedicated and self-contained facilities” for highly sensitising materials such as penicillins. Part XIII adds separate areas and equipment for penicillin tablets (3.2) and for penicillin capsules (5). For a beta-lactam line, budget a second set of machines and a separate HVAC zone.[1]

    3. Oral liquids: the DEG/EG lesson is now an inspection item

    On 7 October 2025, after child deaths in Madhya Pradesh and Rajasthan linked to contaminated cough syrup, the DCGI asked state drug controllers to make sure manufacturers test every batch of raw material, including excipients, and every batch of finished product before release. The advisory cited rules 74(c) and 78(c)(ii) of the Drugs Rules and called for a robust vendor-qualification system.[5] US FDA guidance (2023) recommends testing high-risk components such as glycerin, propylene glycol and sorbitol solution for diethylene glycol (DEG) and ethylene glycol (EG).[6]

    The machinery consequence: a syrup plant’s budget must include QC capacity for DEG/EG testing (usually gas chromatography) or a contract with an approved testing laboratory. This is not optional in 2026.

    Schedule M status (checked 12 Oct 2026): Revised Schedule M was notified on 28 Dec 2023 and was later retitled the Drugs (Second Amendment) Rules, 2023, by corrigendum G.S.R. 666(E).[1][2] It applied to large manufacturers (turnover above ₹250 crore) six months after publication. MSMEs that applied in Form A had until 31 Dec 2025.[3] On 7 Nov 2025 the DCGI directed state regulators to inspect units and report monthly.[4] Re-check our Revised Schedule M compliance dashboard before relying on this.

    How to buy pharma machinery that passes inspection

    Before the purchase order

    • Write a user requirement specification for each machine: capacity, batch size, product range.
    • Get a design qualification (DQ) from the vendor: drawings, contact-part materials, and a list of every surface that touches product.
    • Ask for material-of-construction certificates for contact parts. Schedule M asks for stainless steel or another appropriate material that is not reactive, additive or absorptive (Part I 13.9; Part IX 2.7).
    • Check spares availability and service response near your site.

    At delivery and installation

    • Factory and site acceptance tests against the specification.
    • Installation qualification (IQ) and operational qualification (OQ), then performance qualification or process validation (PQ/PV) on your product (Part I 5.3).
    • Calibration of every gauge, sensor and balance that gives a GMP reading (Part I 13.5).
    • Cleaning procedure written and validated for shared equipment (Part I 13.12).

    Second-hand machinery

    • Acceptable if it is qualified like new equipment. Any significant equipment change must be qualified and validated (Part I 5.4).
    • Inspect contact surfaces for pitting, welds and earlier product residues.
    • Get the original manuals and drawings. Without them, DQ and IQ have to be rebuilt.
    • Confirm that spares for the model are still made.

    Examples of Indian machinery makers by equipment family

    Each product range below was checked on the maker’s own website on 12 Oct 2026. These are examples, not endorsements: Laafon does not certify vendors, and you should collect at least three quotations.

    Scroll the table sideways →

    Maker (location)Relevant range listed on its websiteSectionWebsite
    Cadmach (Ahmedabad, Gujarat)Tablet presses (small to high scale), roll compactors, comminuting mills, tablet toolingTabletscadmach.com
    Gansons (Thane, Maharashtra)Fluid bed dryers and processors, high-shear mixer granulators, tablet coatersTablets, capsulesgansons.com
    Lodha International LLP (Ahmedabad, Gujarat)Liquid filling, cap sealing (screw and ROPP), bottle washing, sticker labelling machinesOral liquidslodhapharma.com

    Turn this machinery list into a project cost

    Machinery is only one part of the capex. The section-wise package also includes the air-handling unit, the classified area, qualification and licensing. The calculator prices all of it for your sections and capacity, at Revised Schedule M, WHO-GMP, EU-GMP or US-oriented standard.

    Estimate your plant setup cost

    Buy

    An existing licensed unit comes with its machines installed. Browse pharma plants for sale in India, then run the 50-point acquisition checklist on its equipment.

    Rent or contract

    See licensed pharma units for rent, or manufacture through a loan licence before you invest in machines of your own.

    Pharma machinery list: frequently asked questions

    References

    1. Ministry of Health and Family Welfare (India). G.S.R. 922(E): Drugs Rules, 1945 – Schedule M (Good Manufacturing Practices and Requirements of Premises, Plant and Equipment for Pharmaceutical Products), Parts I, VIII, IX and XIII. Gazette of India, Extraordinary, Part II, Sec. 3(i). New Delhi; 28 Dec 2023. Available from: CDSCO Gazette Notifications. Accessed Oct 2026.
    2. Ministry of Health and Family Welfare (India). G.S.R. 666(E): Corrigendum to G.S.R. 922(E) dated 28 December 2023. Gazette of India, Extraordinary. New Delhi; 25 Oct 2024. Available from: CDSCO Gazette Notifications. Accessed Oct 2026.
    3. Ministry of Health and Family Welfare (India). G.S.R. 127(E): Extension of timeline for implementation of Schedule M. Gazette of India, Extraordinary. New Delhi; 11 Feb 2025. Available from: CDSCO Gazette Notifications. Accessed Oct 2026.
    4. Business Standard. CDSCO asks state units to start inspections under Schedule M norms. New Delhi: Business Standard; 8 Nov 2025. Available from: business-standard.com. Accessed Oct 2026. (Secondary source; the CDSCO letter was not available online.)
    5. Press Trust of India. Drug controllers urged to ensure testing of pharma products before releasing them in market. The Week; 8 Oct 2025. Available from: theweek.in. Accessed Oct 2026. (Secondary source reporting the DCGI advisory of 7 Oct 2025.)
    6. US Food and Drug Administration. Testing of Glycerin, Propylene Glycol, Maltitol Solution, Hydrogenated Starch Hydrolysate, Sorbitol Solution, and Other High-Risk Drug Components for Diethylene Glycol and Ethylene Glycol; Guidance for Industry; Availability. Federal Register. 2023 May 10;88(90):30139. Available from: regulations.gov. Accessed Oct 2026.

    Reviewed by Darshan Singh, M.Sc. Organic Chemistry, D.Pharm; former QC Head, QA Head and Plant Head; co-founder, Laafon Galaxy Pharmaceuticals.

    This page is technical and educational information for pharmaceutical professionals, not legal, regulatory or investment advice. Indian statutory instruments, CDSCO advisories and pharmacopoeial texts change often. Confirm the current text with CDSCO and your State Licensing Authority before you place orders or file a licence application. Vendor names are examples only, and cost figures are indicative, not quotations.

    Darshan Singh
    Darshan Singh

    Author is a pharmaceutical quality and regulatory professional with more than 23 years in drug manufacturing. He holds an M.Sc. in Organic Chemistry and a Diploma in Pharmacy. He has served as Quality Control Head, Quality Assurance Head and Plant Head, overseeing all manufacturing operations. He is co-founder and regulatory consultant at Laafon Galaxy Pharmaceuticals. He writes on SOPs, manufacturing processes, Schedule M compliance and drug pharmacology, and checks each claim against pharmacopoeial and regulatory sources.

    Articles: 233