Plant listing · Tahliwal, Una, Himachal Pradesh
GMP Pharmaceutical Unit for Sale in Una, Himachal Pradesh
A running, cGMP-approved tablet, capsule and liquid oral plant at Phase III, Industrial Area Tahliwal, Tehsil Haroli, District Una. Installed in 2022, 12,000 sq. ft. constructed, asking price ₹6.5 crore.
Quick answer
Is this pharma unit for sale in Una worth a closer look?
It is a running plant built in 2022 with 12,000 sq. ft. constructed, Form 25 and Form 28 licences, and a seller-stated EBITDA margin of 15–25%, asking ₹6.5 crore. Our due diligence score is 3.0 out of 5 on disclosed information only: turnover, working capital and modernisation cost are not disclosed, and a state cGMP approval is not a WHO-GMP certificate. It suits a domestic-market buyer who will check the documents before committing.
Last reviewed 13 November 2026 · Figures supplied by the seller
Video
Watch the 3-minute unit walkthrough
A short video of the Una plant with the key facts, the certification reality check and the buyer checklist. Spoken in Hindi, with on-screen cards in English.
What the video covers
- Location, installation year and the three manufacturing sections
- Capacity per 8 hours: 5 lakh tablets, 3 lakh capsules, 20,000 bottles of liquid oral
- Form 25 and Form 28 licences, 250+ approved formulations, 30 clients
- State cGMP is not WHO-GMP, and why that matters
- The seller-stated EBITDA band and our 3.0 / 5 due diligence score
- The 11-point buyer checklist
At a glance
Pharma unit for sale in Una: facility overview
This pharma plant for sale in Himachal Pradesh was installed in 2022 and operates as a partnership entity, manufacturing generic and ethical products in tablet, capsule and liquid oral (syrup) dosage forms. It runs its own purified water system and holds two manufacturing licences.
| Parameter | Details |
|---|---|
| Location | Phase III, Industrial Area Tahliwal, Tehsil Haroli, District Una, Himachal Pradesh |
| Year installed | 2022 |
| Land area | 800 square yards (approximately 7,200 sq. ft.) |
| Constructed area | 12,000 sq. ft. |
| Manufacturing sections | Non-Beta tablets, Non-Beta capsules, liquid orals (syrups) |
| Not licensed for | Injectables |
| Certification | cGMP approved (state GMP). WHO-GMP, ISO and export certification: none disclosed |
| Licences | Form 25 and Form 28, Drugs Control Authority, Dharamshala, Himachal Pradesh. Licence numbers are shared after NDA |
| Product range | 250+ approved formulations across 8 therapeutic categories |
| Third-party manufacturing | 30 client parties |
| Purified water system | 1,000 litres/hour generation, 2,000 litre overhead storage |
| Business model | Partnership entity · generic and ethical segment |
| EBITDA margin (seller-stated) | 15–25% |
| Asking price | ₹6.5 crore |
Location
Why Tahliwal, Una works as a manufacturing base
Tahliwal is in Tehsil Haroli, about 16 km from Una town, and is one of the established industrial areas of Una district alongside Mehatpur and Gagret. A buyer of a manufacturing unit here can draw on a local workforce and on suppliers and testing laboratories already serving the Una and Himachal pharma belt.
Connectivity
Road, rail and air links
- Chandigarh: roughly 110–130 km by road, depending on the route. Check the exact route on a map.
- Nearest major airport: Chandigarh International Airport.
- Nearest railway: Una Himachal, approximately 16 km.
- Pin code: 174301 (Santokhgarh post office).
Administration
District and regulatory contacts
The unit falls under District Una administration. Its manufacturing licences are issued by the Drugs Control Authority, Dharamshala, under the Himachal Pradesh state drugs control administration. Confirm licence status, the endorsed product list and inspection history directly with the licensing authority before signing.
- District portal: hpuna.nic.in
- Assembly constituency: Haroli · Lok Sabha: Hamirpur
Compliance
Certification and regulatory status
The facility is a cGMP-approved unit licensed to manufacture tablets, capsules and syrups. Premises, plant and equipment are stated to be designed around Schedule M of the Drugs Rules, 1945,1 following the core principles of WHO good manufacturing practice for pharmaceutical products.2 The listing does not say whether that means the revised Schedule M notified in December 2023, so ask.
What the two licences mean
Form 25 and Form 28 read together
Form 25 is the licence to manufacture drugs other than those specified in Schedules C, C(1) and X, which covers ordinary tablets, capsules and syrups. Form 28 is the licence to manufacture drugs specified in Schedules C and C(1), the biological and other special products, excluding Schedule X.
The two licences carry different endorsed product lists. Ask for the full Form 25 and Form 28, both product schedules, and the current renewal status before you value the business.
Quality systems
What to inspect on site
- Approved SOP set and its revision history, including change control and deviation records.
- Purified water system qualification, sanitisation records and trend data. See FDA guidance on high-purity water systems for what an auditor will expect.
- Equipment and area qualification files (DQ/IQ/OQ/PQ), plus HVAC validation for the manufacturing and QC areas.
- Batch manufacturing records and stability data for the fastest-moving products.
- If regulated-market export is a goal later, compare current systems against WHO-GMP and USFDA expectations.
Important: a state cGMP approval is not a WHO-GMP certificate and does not carry a WHO-GMP Certificate of Pharmaceutical Product. No WHO-GMP, ISO or export-market certification has been disclosed for this unit. Treat it as a domestic-market plant unless the seller produces documents that say otherwise.
Revised Schedule M: the revised Schedule M (G.S.R. 922(E), December 2023) raised the GMP requirements, and the extended deadline for small and medium manufacturers was 31 December 2025. Ask the seller for the unit’s own gap assessment against it and any upgrade plan filed. Current status is tracked on our revised Schedule M status page.
Decision support
Due diligence score
A conservative reading of the disclosed information only. Categories with thin disclosure are scored low on purpose. A low score here means missing evidence, not a proven weakness.
Overall, disclosed information only
15 of 25 points. Expect this to move once financials and licence copies are shared.
Before you sign
Buyer checklist: 11 points to clear
Tick items as you clear them. Nothing is stored or sent, and the list resets when you reload the page.
Checklist progress
0 of 11 items cleared
Numbers
Investment snapshot
Only the purchase price and the EBITDA margin band have been disclosed. Everything else is marked as such, rather than filled in with an estimate.
Indicative payback model
Test the deal against your own numbers
Enter the turnover and extra investment you expect. The figures below are produced from your inputs, not from seller data.
Read this before using the numbers: the 15–25% EBITDA band, the 250+ formulation count and the 30-client figure are seller-provided and unaudited. The calculator above works on figures you type in. It ignores interest, depreciation, tax, stamp duty and transfer costs, and is not a valuation, forecast or financial advice. Have a chartered accountant and a lawyer run the actual numbers.
Data quality
Points that need clarification
- Land versus built-up area. 800 square yards is about 7,200 sq. ft. of land, against 12,000 sq. ft. constructed, so the building must have more than one level. Check the approved building plan, the number of floors and the permitted floor area before you assume any room to expand.
- Product range is not capacity. “250+ formulations” describes approved products, not output. Ask for tablets, capsules and bottles per shift, machine-wise, and reconcile it with electricity consumption.
If you are comparing this against building new, run the numbers through the pharma plant setup cost calculator. If the plan is to load the plant with your own brands, see how PCD and propaganda-cum-distribution models work. Buyers who need sterile capacity instead should look at injectable manufacturing, which this unit is not licensed for.
FAQs
Questions buyers ask about this unit
Darshan Singh
Founder, Laafon Galaxy Pharmaceuticals · 23 years in pharmaceutical QA/QC & drug regulatory affairs.
Request licences, machinery list and financials
Send an enquiry and we will share the available documents and arrange a site visit at Tahliwal. Independent verification and professional due diligence are recommended before any commitment.
More listings and advisory: browse all pharma plants for sale or contact Laafon Galaxy Pharmaceuticals.
References
- Central Drugs Standard Control Organisation. Schedule M, Good Manufacturing Practices and Requirements of Premises, Plant and Equipment for Pharmaceutical Products, as revised by G.S.R. 922(E) (December 2023). Ministry of Health and Family Welfare, Government of India. cdsco.gov.in
- World Health Organization. WHO good manufacturing practices for pharmaceutical products: main principles. WHO Technical Report Series No. 986, Annex 2, 2014.
Listing details, capacities, certifications, workforce figures, availability and commercial figures are supplied by the seller for enquiry purposes and should be independently verified. Licence numbers, the company name and the full address are not published here; they are shared with serious buyers after NDA. This content is not legal, regulatory, investment or financial advice.

