Revised Schedule M//Self-Audit Instrument//Instant Delivery

Revised Schedule M Gap Assessment Toolkit

A working self-inspection instrument for Indian drug manufacturing units. 272 assessable requirements, each written the way an inspector will verify it, each paired with the exact document you must produce. Scores itself, weights findings by risk, and outputs a CAPA roadmap with a remediation budget.

₹4,999 One-time · single-site licence · no subscription
272Assessable items
22Part I sections
8Linked worksheets
23Years QA / QC / DRA

Regulatory context//Where the deadline now stands

The preparation window has closed. The inspection window is open.

Revised Schedule M was notified in December 2023. Large manufacturers came under it in 2024. Small and medium units that applied for the conditional extension came under it from 1 January 2026. CDSCO has since directed state licensing authorities to plan and carry out verification inspections at the units that took that extension.

The question has changed

It is no longer "how much time do we have". It is "can we demonstrate compliance when the inspector arrives, and can we produce the evidence for each requirement". A unit that cannot show a documented self-assessment, a gap register and a dated remediation plan is in a materially weaker position than one that can — regardless of how good the plant actually is.

The product//Eight linked worksheets

What is inside the file

One Excel workbook. Everything cross-references: the gap sheets feed the dashboard, the dashboard feeds your management review, the CAPA tracker feeds your budget.

Sheet 01

Read Me

Scope, scoring convention, risk-rating definitions, weighting methodology and licence terms. Written so a new QA executive can pick the file up without being briefed.

Sheet 02

Facility Profile

Licence numbers, turnover category, extension status, assessment team and dates. This becomes the cover page of your gap assessment report.

Sheet 03

Compliance Dashboard

Section-wise compliance percentage, risk-weighted score, open Critical and Major counts, and a chart. Recalculates as you fill the assessment.

Sheet 04 — the core

Part I Gap Assessment

All 22 sections of Part I: PQS, QRM, sanitation, qualification and validation, complaints, recalls, change control, contract manufacture, self-inspection, personnel, premises, equipment, materials, documentation, production, quality control and computerised systems.

181 line items

Sheet 05

Dosage Form Specific

Sterile and ophthalmic, hazardous substances, oral solids, oral liquids, external preparations, metered dose inhalers and active pharmaceutical ingredients. Filter to your licence and mark the rest not applicable.

59 line items

Sheet 06

Site Master File Checklist

All nine SMF sections, item by item. An absent or outdated Site Master File is among the most routinely cited findings at Indian units.

32 line items

Sheet 07

CAPA Tracker

Root cause, immediate correction, corrective action, preventive action, owner, target date, effectiveness check, estimated cost. Totals into a single remediation budget figure.

Sheet 08

Inspection Readiness Register

The 26 documents most often called for in the first two hours of an inspection, with a location and status field for each. Use it as a dry run the week before.

Built in

Protected formulas

Scoring columns are locked so nobody breaks the calculation by accident. Filters, sorting and every input cell stay fully open.

Specimen//Actual rows from the file

What a line item looks like

The second column is what separates this from a free checklist. A generic list tells you to "have cleaning validation". This tells your QA head precisely which document to place on the table.

Ref ID Requirement as the inspector will verify it Objective evidence expected Status Risk
P1-05-007 Cleaning validation uses worst-case product selection, MACO calculation, and a validated analytical method with recovery study. Cleaning validation protocol and report; swab recovery data Non-Compliant Critical
P1-14-003 Segregated facilities with independent AHUs and separate entry and exit exist for beta-lactams, cephalosporins, hormones and cytotoxics as applicable. Layout; AHU schematics; differential pressure records Compliant
P1-19-009 A data integrity policy implements ALCOA+ principles: no back-dating, no shared logins, no uncontrolled loose sheets. DI policy; DI training records; audit trail review records Partial Major
P1-21-005 Control samples of finished product are retained in the marketed pack for the prescribed period beyond expiry. Control sample room; retention register Compliant

Status and risk are dropdowns · colour coding is automatic · scoring columns not shown

Methodology//Two numbers, not one

Why the toolkit reports a risk-weighted score

A plain percentage flatters a plant. If ninety small documentation items are in order and four critical validation failures are open, a simple count reports something close to ninety-six per cent. The weighted score refuses to do that.

Figure one

Compliance %

Counts every requirement equally. Answers the question: how much of Schedule M do we currently meet? Useful for tracking progress month to month.

Figure two

Risk-weighted compliance %

A Critical finding is weighted three times a Minor one, a Major twice. Answers the question the inspector is actually asking: how exposed are we? A site can show eighty-five per cent plain and sixty per cent weighted — and that gap is exactly where an inspection lands first.

Honest scope//Before you pay

Who this is for, and who it is not for

Buy it if

  • You are a QA head or plant head at an MSME formulation or API unit preparing for a state FDA or CDSCO verification inspection
  • You took the conditional extension and now need a documented self-assessment on file
  • You are preparing for WHO-GMP renewal or a contract-giver audit
  • You need a costed remediation plan to put in front of a director or a lender
  • You are a consultant who wants a defensible framework instead of rebuilding a checklist per client

Do not buy it if

  • You want a certificate, an approval, or anything a licensing authority issues — this is a self-assessment instrument, not a credential
  • You want the Schedule M text itself; the gazette notification is free and you should read it
  • You want somebody to visit your plant and write the report for you — that is a consulting engagement, not a file
  • You expect it to close gaps on its own. It finds and prioritises them. Closing them is capital expenditure and calendar time

Process//From payment to management review

How you will actually use it

Pay and receive

Pay by UPI and submit the short form. The workbook is issued to your company name and emailed personally, usually within a few hours and always within 24 hours.

Set up, day one

Complete the Facility Profile. Fifteen minutes. This is the cover page of the report you will hand to your director.

Walk Part I, section by section

Filter to one section, sit with the department head responsible, and set a status on every row. Most units complete Part I across three to five working sessions.

Rate the gaps

Assign Critical, Major or Minor to every Partial and Non-Compliant row. The weighted score rebuilds itself as you go.

Build the CAPA roadmap

Raise a CAPA line for each gap with an owner, a target date and an estimated cost. The tracker totals your remediation budget in one figure.

Take it to management review

Present two numbers and one count: plain compliance, weighted compliance, open Critical findings. Repeat the assessment quarterly and the trend becomes your evidence of continuous improvement.

Provenance//Who compiled this

The experience behind the file

DS

Darshan Singh

Quality Assurance · Quality Control · Drug Regulatory Affairs

Twenty-three years in pharmaceutical quality assurance, quality control and drug regulatory affairs in India. The requirement wording in this toolkit is not paraphrased from a summary article — it is written the way findings are actually raised and defended in an inspection, and the evidence column reflects what is actually asked for across the table.

Founder of Laafon Galaxy Pharmaceuticals, working across regulatory consulting, plant transactions and manufacturing advisory for Indian pharmaceutical units.

Before you buy//Common questions

Frequently asked questions

A single Excel workbook (.xlsx). It opens in Microsoft Excel, LibreOffice Calc and WPS Office. Dropdowns, conditional colouring and the dashboard chart behave best in Excel. It is not a PDF and not a web application — it is a file you own and edit.

Usually within a few hours of the payment being confirmed, and always within 24 hours. Each copy is issued to your company name before it is sent, so delivery is manual rather than instant.

Pay by UPI to the account of Laafon Galaxy Pharmaceuticals using the QR code or UPI ID in the payment section, then submit the short form with your UPI reference number. The payment is matched against the bank credit before the file is issued. There is no card entry and no third-party checkout.

The standard licence covers internal use at one site by the purchasing organisation. If you operate several units or you are a consultant using it across clients, write to contact@laafon.com and a multi-site licence will be quoted.

No, and it is not sold as one. It replaces the six to ten hours a consultant would otherwise bill for building an assessment framework, and it gives you a structured, evidence-linked picture of your own gaps. Judgement calls on borderline findings, remediation design and inspection defence still benefit from an experienced pair of eyes.

It follows the Revised Schedule M notified vide G.S.R. 922(E) dated 28 December 2023. The Read Me sheet asks you to verify clause references against the gazette notification and any subsequent amendment applicable on your assessment date before formal submission to a licensing authority.

Yes. Every input cell is unlocked and you can add rows, columns and your own sections. Only the three scoring columns are protected, so that the dashboard cannot be broken by accident. Sheet protection carries no password and can be removed if you want to restructure the calculation.

This is a digital product delivered as a file, so no refunds are offered once the workbook has been sent. Everything material about what is inside is set out on this page, including what it deliberately does not do. If anything is unclear, ask before you pay — WhatsApp is the fastest route.

Purchasers are emailed a revised workbook at no additional charge if a substantive amendment to Schedule M materially changes the requirement set, for twelve months from the date of purchase.

Find out where the facility actually stands before somebody else tells you

Two hundred and seventy-two requirements, the evidence expected against each, a risk-weighted score and a costed remediation plan. One file, one payment, no subscription.

Step 1 of 2 — Payment

Get the Gap Assessment Toolkit

Pay by UPI, then fill the form so the licensed copy reaches the right inbox. Files are issued personally, usually within a few hours and always within 24 hours.

Single-site licence

₹4,999

One-time · no subscription

Pay ₹4,999 by UPI
UPI QR code for Laafon Galaxy Pharmaceuticals

Laafon Galaxy Pharmaceuticals · ICICI Bank

9812346283@ibl
  1. Scan the code with any UPI app, or tap the green button on mobile.
  2. Enter the amount as ₹4,999 — this QR does not pre-fill it.
  3. Complete the payment and note the UPI reference number.
  4. Fill the form and submit. Your copy is emailed after the credit is confirmed.

Step 2 of 2 — Delivery details

Found in your UPI app under transaction details. This is how the payment is matched to your order — please copy it exactly.

By submitting you accept the single-site licence: internal use at one manufacturing site, no resale or redistribution. Digital product — no refunds once the file has been delivered. See the refund policy and terms.

This toolkit is an aid to self-inspection. It does not constitute regulatory or legal advice, does not replace inspection by the licensing authority, and confers no approval or certification of any kind. Single-site licence: internal use at one manufacturing site by the purchasing organisation; resale and redistribution are not permitted.

Revised Schedule M Gap Assessment Toolkit
272 items · 8 worksheets · single-site licence
₹4,999 Get it